Comparison of RU

vytlacit_aktualnu_stranku poslat_link_znamemu
Back
STANDARD 207
STANDARD 205
STANDARD 202
Budgeted costs for turnkey construction: 168 000 EUR 472 856 EUR 267 444 EUR
Number of floors: 2 3 3
Number of apartments: 4 12 6
Size of apartments: large large
Total costs per m2 of apartment floor space: 715 EUR 538 EUR 505 EUR
Characteristics: BD ŠTANDARD 07 is 2-story apartment house with untentable attic and without basement, which is suitable for plain or slightly sloping terrain • 4 apartments are divided in two on each floor • the disposition and construction on the ground floor is designed a residential unit for people with reduced mobility • all other apartments are designed for standard-type housing • 3-bedroom housing units satisfy by their disposal the demands for a 4-member family • relatively simple cubistic shape is divided from the front side by the balconies and a covered entry • object can also be placed in the row building, possibly with the three floors, it creates a variety of 8 or 12 housing units.BD ŠTANDARD 07 is a 2-story object is covered by saddle roof • the bearing system is a combination system of Ytong poruses-concrete blocks or brick system Wienerberger and monolithic horizontal structures• span roof structure is designed as a wooden construction system with concrete roofing Bramac • two-armed staircase and balcony panels are from monolithic reinforced concrete, balcony railings are designed from steel elements• overhangings of the roof protect from the adverse effects of weather • individual apartments are heated by boilers attached to a common chimney • the fundations are solved through base belts of bulk concrete BD ŠTANDARD 05 has three above-grade floors • it is coverd by saddle roof with a small glass, the attic is untenantable • the object is without basement, suitable for a plain terrain especially for cities • residential house is divided into two operationally separated sections, each is made available by their own entrance• on the ground floor are four apartments - two 3 bedroom and two 2 bedroom, including one barrier-free• apartments on upper floors are 3 bedroom with standard equipment• BD ŠTANDARD 05 3-story object with crossbearering system • vertical bearing structures consist of walls of the precise Hebel blocks, horizontal structures and stairways are designed from a monolithic reinforced concrete • structure of rafters is designed as a wooden construction system with sheet-metal roofing Rannila • railings of the balconies are masonry or perforated metal sheets, or a combination of both types • balconies are protected from the atmospheric elements by overhanging roof• foundation constructions are designed as base belts • each apartment is heated by its own boiler BD STANDARD 02 with the three floors without basement, it is suitable for plain, or slightly sloping terrain• house is made up primarily of 3 bedroom apartments, 2 bedroom housing unit on the ground floor meets the conditions for the use of a person using a wheelchair • the comfort of attic apartments is increased by large pent dormers and a relatively high-set span roof• substantial dormers predestine this object in particular to rural areas and to outlying parts of cities • BD ŠTANDARD 02 is 3-level object, the highest level is designed as a residential attic • the bearing system is a combination of a building system Hebel with monoithic horizonatal ceiling structers, balconies and a staircase • construction of saddle roofs with pent dormers is designed as a wooden construction system with concrete roofing Bramac• railings of the balconies are punched metal sheets welded to the construction of light gauge steel profiles • protection of balconies against weather provide overhanging roofs and dormers • individual apartments are heated by boilers attached to a common chimney • the fundations are solved through base belts of bulk concrete

More about project

More about project

More about project
Rodinné domy Euroline to je kvalita za nízku cenu
EUROLINE Slovakia s.r.o © 1995 - 2012 | Created by SCR interactive 2012